Common problems and maintenance of CNC robots

Apr 17, 2026

Leave a message

Installation Phase
Foundation Requirements: The load-bearing capacity must be at least 500 kg per square meter. Dampers must be installed in areas with high vibration.
Electrical Interference: Power cables and control cables must be routed separately, with a spacing of at least 30 cm.

 

Daily Maintenance
Check the grease condition of the harmonic reducer weekly.
Calibrate the zero-point position of each axis quarterly.
Avoid cold starts in environments below 0°C.

 

Performance Optimization
Multi-axis robot controllers enable more complex motion trajectory planning.
High-quality robot grippers reduce replacement frequency.